The RP's OSRO placing sorbent boom between the discharge location and the entry to the Unnamed Creek.
20250511
5/11/2025
The impacted soil and vegetation between the discharge location and the entry to water.
20250511
5/11/2025
The RP's OSRO using water pumps to flush the Unnamed Creek to a recovery point at the Cargo Road low-water crossing.
20250511
5/11/2025
The RP's OSRO using water pumps to flush oil and clean vegetation at the pond near Cargo Road.
20250511
5/11/2025
The confluence of the Unnamed Creek and Wildhorse Creek.
20250511
5/11/2025
Response activities at the confluence of the Unnamed Creek and Wildhorse Creek.
20250510
5/10/2025
EPA OSCs at the confluence of the Unnamed Creek and Wildhorse Creek.
20250510
5/10/2025
EPA OSCs at a recovery location at the end of Washington street, approximately 0.5 miles upstream of the confluence of the Uknown Creek and Wildhorse Creek.
20250510
5/10/2025
EPA, the RP and the RP contractors at the Washita River bridge on Highway 7.
20250509
5/9/2025
Hard and sorbent boom being used to contain oil at the confluence of the Unnamed Creek and Wildhorse Creek.
20250509
5/9/2025
A vacuum truck being used for recovery at the Napa Road bridge.
20250509
5/9/2025
One of the two vacuum trucks being used for recovery at the Cargo Road low-water crossing.
20250509
5/9/2025
Impacted soil at the tank battery near the discharge location.
20250508
5/8/2025
Where the crude oil entered the Unnamed Creek.
20250508
5/8/2025