United
States Environmental Protection Agency
Region IV
POLLUTION REPORT
|
| Date: |
Thursday, March 13, 2014
|
| From: |
Perry Gaughan, OSC
|
| To: |
James Webster, USEPA R4 ERRB
|
William D Adkins, USCG NPFC
|
|
Robert Blair, Emergency Response Branch Manager
|
Greg Harper, USEPA R4 ERRB
|
|
Subject:
|
TVA continues O&M of Oil Collection System
Boyd's Creek III Oil Site
Oil Well Road,
Glasgow, KY
Latitude: 36.9428600 Longitude: -85.9426100
|
| POLREP No.: |
37
|
Site #:
|
Z426
|
| Reporting Period: |
1/01/2013 to 2/4/2014
|
D.O. #:
|
|
| Start Date: |
6/1/1993
|
Response Authority:
|
OPA
|
Mob Date: |
6/1/1993
|
Response Type:
|
Non-Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
|
|
|
The incident involves an ongoing discharge of crude oil into Boyd’s Creek and the Barren River Lake which is a navigable waterway. This ongoing removal action was continued under an Interagency Agreement between EPA Region 4 and the Tennessee Valley Authority. Funding was obtained under the OSC’s OPA authority and through support from the National Pollution Fund Center in December, 2008.
|
|
This report summarizes the operations and maintenance (O&M) activities Tennessee Valley Authority (TVA) performed for the U. S. Environmental Protection Agency’s (USEPA) Boyds Creek crude oil recovery project located in Glasgow, Kentucky. This report covers the 14-month monitoring period of December 19, 2012 through February 3rd, 2014. The funding for the project is through an Interagency Agreement (IAG) DW-64-92319301-0 between TVA and EPA. TVA performed basic O&M activities at the Boyds Creek facility during (7) site visits conducted throughout the 14-month period. Following the upgrade of the monitoring system in 2012 the frequency of site visits has been reduced due to the new system’s reliability. Site operating conditions were normal with no system upsets (oil release) being observed during the monitoring period. Approximately 3,330 gallons of oil were collected during the monitoring period, with the largest amount (2300 gallons) being collected during the January 30th, 2014 site visit.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| IAGs |
$50,000.00 |
$40,000.00 |
$10,000.00 |
20.00% |
|
Intramural Costs
|
| |
| Total Site Costs |
$50,000.00 |
$40,000.00 |
$10,000.00 |
20.00% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/BoydsCreek
POLREP #37 Last Updated 3/13/2014
|