POLLUTION REPORT
|
| Date: |
Tuesday, January 27, 2015
|
| From: |
Perry Gaughan, OSC
|
| To: |
James Webster, USEPA R4 ERRB
|
William D Adkins, USCG NPFC
|
|
Robert Blair, Emergency Response Branch Manager
|
Greg Harper, USEPA R4 ERRB
|
|
Subject:
|
EPA ERT Geophysics Assessment Report
Boyd's Creek III Oil Site
Oil Well Road,
Glasgow, KY
Latitude: 36.9428600 Longitude: -85.9426100
|
| POLREP No.: |
39
|
Site #:
|
Z426
|
| Reporting Period: |
6/01/14 to 1/23/15
|
D.O. #:
|
|
| Start Date: |
6/1/1993
|
Response Authority:
|
OPA
|
Mob Date: |
6/1/1993
|
Response Type:
|
Non-Time-Critical
|
| Demob Date: |
|
NPL Status:
|
Non NPL
|
| Completion Date: |
|
Incident Category:
|
Removal Action
|
| CERCLIS ID #: |
|
Contract #
|
|
| RCRIS ID #: |
|
Reimbursable Account #
|
|
| FPN# |
|
|
|
Over recent months, the National Pollution Fund Center and US Coast Guard Case Officers have encouraged EPA Region 4 to conduct additional efforts at closing this Site out since it has been an ongoing response since the early 1990's. The OSC received additional funding from NPFC to conduct an additional geophysics assessment upgradient of the collection system in an effort to find remnants of old abandoned oil wells. Similar efforts performed by OSCs Webster and Eger during the 1990s and 2003 proved successful in finding abandoned wells and has decreased the flow of oil contaminated groundwater to the collection system.
This Site involves an ongoing discharge of crude oil into Boyd’s Creek and the Barren River Lake which is a navigable waterway. This ongoing removal action was continued under an Interagency Agreement between EPA Region 4 and the Tennessee Valley Authority. Funding was obtained under the OSC’s OPA authority and through support from the National Pollution Fund Center in December, 2008.
|
|
During the week of June 2nd, 2014, EPA ERT's Greg Powell and technical contractors from SERAS conducted the geophysics assessment upgradient of the oil water collection system. A report summarizing these assessment findings was submitted to the OSC during the week of Jan 19th, 2015. (Documents Section - SERAS report and Figures Attachment)
Based on the findings of the geophysics study, two new anomalies were found which should be further investigated. (See Figure 8 of Figures Attachment in Document Section) In a follow up email from Greg Powell he recommended that; " Anomaly One will have to be evaluated using a Geoprobe or hollow stem auger rig to evaluate the presence or absence of brine and crude oil. Flow should occur down dip along the possible fracture identified in the VLF. The fracture would provide sufficient weakness to account for the shallow karst features that have developed at the soil bedrock interface. I conducted a cursory lineament analysis of the Glasgow South Quadrangle. Numerous lineaments appear to be present with a southeast to northwest orientation. These lineaments probably represent fracture zones that have developed.."
Anomaly Two can be evaluated with an excavator. Bedrock is shallow in this area and ERT recommends cutting a south to north trench along the high conductivity trend. This should be the first exploration area due to the ease of evaluating the presence of abandoned wells.
|
|
TVA continues operation and maintenance of the Oil/Water collection system on Site. Approximately 1500 gallons of oil was collected in January 2015 and some minor repairs to the collection sumps are planned for February.
|
|
Geoprobe assessment of the upper field anomaly and shallow excavation of the anomalies near the collection system are currently being planned for the spring of 2015.
|
| |
Budgeted |
Total To Date |
Remaining |
% Remaining |
|
Extramural Costs
|
| IAGs |
$50,000.00 |
$10,000.00 |
$40,000.00 |
80.00% |
| REAC |
$30,000.00 |
$25,000.00 |
$5,000.00 |
16.67% |
|
Intramural Costs
|
| |
| Total Site Costs |
$80,000.00 |
$35,000.00 |
$45,000.00 |
56.25% |
* The above accounting of expenditures is an estimate based on figures known to the OSC at the time this report was written. The OSC does not necessarily receive specific figures on final payments made to any contractor(s). Other financial data which the OSC must rely upon may not be entirely up-to-date. The cost accounting provided in this report does not necessarily represent an exact monetary figure which the government may include in any claim for cost recovery.
response.epa.gov/BoydsCreek
POLREP #39 Last Updated 1/27/2015
|