File Name
Category
Uploaded
Bauer Tailings Action Memo Signed.pdf
EPA Action Memorandum signed August 26, 2021.
Admin Record
8/31/2021
806 KB
Download
PHA_2006.pdf
ATSDR Public Health Assessment for the Bauer Dump & Tailings and Blackhawk Resin Company
1 Action Memo
8/24/2021
1507 KB
Download
Dillenbeck_2018.pdf
Evaluation of surface soil metals concentrations at the Bauer Tailings site
1 Action Memo
8/24/2021
182399 KB
Download
Figure1_XRFLead.pdf
Map of XRF lead concentrations in surface soils at the Bauer Tailings Site and surrounding area
1 Action Memo
8/24/2021
2484 KB
Download
Bauer Tailings Work Plan - signed.pdf
Utah DEQ Site Reassessment Work Plan
1 Action Memo
8/24/2021
7466 KB
Download
Figure2_XRFArsenic.pdf
Map of XRF arsenic concentrations in surface soils at the Bauer Tailings Site and surrounding area
1 Action Memo
8/24/2021
2590 KB
Download
2021_09_01 Consent for Access Form.pdf
Consent form that was provided to property owner for EPA access to conduct a CERCLA removal action.
2 Access Order
10/21/2021
157 KB
Download
2021_09_01 Request for Access.pdf
Letter provided to registered agent for the property request consent to access the property to conduct a CERCLA removal action.
2 Access Order
10/21/2021
223 KB
Download
2021_09_02 Certified Mail Receipt.pdf
Receipt for certified mail delivery of EPA's request for access to the property.
2 Access Order
10/21/2021
621 KB
Download
2021_09_08 Certified Mail Delivery Report.pdf
Confirmation of certified mail delivery of EPA's request for access to the property.
2 Access Order
10/21/2021
32 KB
Download
2021_09_15-16 Email Correspondence.pdf
Email correspondence between EPA and OSC property owner September 25-16, 2021.
2 Access Order
10/21/2021
141 KB
Download
2021_09_17 Email Correspondence.pdf
Email correspondence from EPA Site Attorney to property owner dated September 17, 2021.
2 Access Order
10/21/2021
142 KB
Download
2021_09_29 Email Correspondence.pdf
Email correspondence between EPA OSC and property owner dated September 29, 2021.
2 Access Order
10/21/2021
118 KB
Download
Account View Parcel 06-017-A-0032.pdf
Tooele County record of property ownership for Parcel 06-017-A-0032.
2 Access Order
10/21/2021
110 KB
Download
Account View Parcel 06-017-C-0029.pdf
Tooele County record of property ownership for Parcel 06-017-C-0029.
2 Access Order
10/21/2021
125 KB
Download
Account View Parcel 06-017-D-0027.pdf
Tooele County record of property ownership for Parcel 06-017-D-0027.
2 Access Order
10/21/2021
119 KB
Download
2021_08_26 Signed Action Memo.pdf
Signed Action Memo dated August 26, 2021.
2 Access Order
10/26/2021
1404 KB
Download
2021_10_26 CERCLA-08-2022-0001 Administrative Order.pdf
Signed Access Order dated October 26, 2021.
2 Access Order
10/26/2021
443 KB
Download
1985 Remediation Order.pdf
Order issued by State of Utah Solid and Hazardous Waste Committee on May 10, 1985 to the property owner of the Blackhawk Resin Site which was a former coal derivative processing facility located contiguous to EPA's Bauer Tailings Site.
3 Blackhawk Resin
12/18/2021
470 KB
Download
1993 Site Inspection.pdf
Site Inspection Prioritization Report generated by EPA Contractors dated August 26, 1993 for the Blackhawk Resin Site which was a former coal derivative processing facility located contiguous to EPA's Bauer Tailings Site.
3 Blackhawk Resin
12/18/2021
908 KB
Download
Bauer Tailings Surface Countours with Ortho-Mosaic 34x44P.pdf
Large format map in pdf format containing the contours derived from UAS footage Includes ortho-mosaic imagery of the site.
4 Maps
12/9/2021
53518 KB
Download
Hot Spot XRF Result Map_Jan 2022.pdf
Hot Spot XRF Result Map conducted in Jan 2022.
4 Maps
4/11/2022
1572 KB
Download
Arsenic XRF Result - Phase 1_Jan 2022.pdf
XRF (Arsenic) Result Map of Phase 1 efforts conducted in Jan 2022.
4 Maps
4/11/2022
1620 KB
Download
Lead XRF Result - Phase 1_Jan 2022.pdf
XRF (Lead) Result Map of Phase 1 efforts conducted in Jan 2022.
4 Maps
4/11/2022
1616 KB
Download
Arsenic XRF Result - Phase 2_Feb 2022.pdf
XRF (Arsenic) Result Map of Phase 2 efforts conducted in Feb 2022.
4 Maps
4/11/2022
1608 KB
Download
Lead XRF Result - Phase 2_Feb 2022.pdf
XRF (Lead) Result Map of Phase 2 efforts conducted in Feb 2022.
4 Maps
4/11/2022
1605 KB
Download
Arsenic XRF Result - Combined Phase 1 and 2.pdf
XRF (Arsenic) Result Map of combined Phase 1 and Phase 2 efforts. Phase 1 conducted in Jan 2022, while phase 2 was conducted in Feb 2022.
4 Maps
4/11/2022
1660 KB
Download
Lead XRF Result - Combined Phase 1 and 2.pdf
XRF (Lead) Result Map of combined Phase 1 and Phase 2 efforts. Phase 1 conducted in Jan 2022, while phase 2 was conducted in Feb 2022.
4 Maps
4/11/2022
1660 KB
Download
Final Bauer Site Trip Report- Phase 1_Rev 02_08.01.2022.pdf
Site Assessment Trip Report for Phase 1 sampling event conducted in January 2022.
8 Data
8/16/2022
6861 KB
Download
Final Bauer Site Trip Report- Phase 2_Rev 01_08.02.2022.pdf
Site Assessment Trip Report for Phase 2 sampling event conducted in February 2022.
8 Data
8/16/2022
13813 KB
Download
Final Bauer Tailings Site History and Status Report_01262023.pdf
Site History and Status Report for the Bauer Tailings Site- January 26, 2023
8 Data
1/27/2023
41411 KB
Download